Oetomo, W. and Setyawan, D. T. (2026) “Bridging Cost Efficiency and Schedule Risks: An Earned Value Approach to Road Infrastructure Project Performance”, Journal of Civil and Enviromental Engineering in the Global South, 1(1), pp. 1–18. Available at: https://ejournal.selectaedukasi.id/index.php/jceegs/article/view/15 (Accessed: 19 May 2026).